RCW 4.24.115 is one of the most important and most overlooked statutes in Washington construction contracting. Property owners, general contractors, subcontractors, design professionals, and suppliers in Snohomish County and King County routinely sign agreements with indemnity clauses that try to shift the risk of injuries and property damage onto someone else. Many of those clauses are written so broadly that part of the language is void the moment the contract is signed. Knowing what the statute allows, and what it forbids, gives you real control over the risk you take on with every project.
At Bountiful Law, we help Washington business owners and contractors review, draft, and negotiate the agreements that hold their projects together. This guide explains what RCW 4.24.115 actually does, how it interacts with other Washington construction rules, and the mistakes that most often leave an indemnity clause weaker than the parties expected, so you can move forward with confidence.
What RCW 4.24.115 Actually Does
Indemnity clauses decide who absorbs the loss when someone is hurt or property is damaged on a project. In many industries, parties have broad freedom to allocate that risk however they like. Washington takes a different approach for construction and several related types of contracts, and the statute sets firm limits that no amount of careful drafting can override.
![]()
Which Contracts the Statute Covers
RCW 4.24.115(1) reaches any covenant, promise, agreement, or understanding in, in connection with, or collateral to a contract relative to the construction, alteration, repair, addition to, subtraction from, improvement to, or maintenance of any building, highway, road, railroad, excavation, or other structure, project, development, or improvement attached to real estate, including moving and demolition connected with that work. The statute also covers contracts for architectural, landscape architectural, engineering, or land surveying services, as well as motor carrier transportation contracts. That breadth matters because an indemnity promise does not have to appear in the main construction contract to be affected. A separate side agreement, purchase order, or rider connected to the project can fall within the statute just as easily.
Indemnity for Sole Negligence Is Void
The first rule in the statute is straightforward. Under RCW 4.24.115(1)(a), a promise to indemnify, including the duty to defend, against liability for damages arising out of bodily injury to persons or damage to property caused by or resulting from the sole negligence of the indemnitee, or the indemnitee’s agents or employees, is against public policy and is void and unenforceable. In practical terms, a general contractor cannot require a subcontractor to protect it from claims that arise entirely from the general contractor’s own negligence. An owner cannot shift the consequences of its own careless conduct onto the contractor through contract language alone. No matter how the clause is worded, that portion simply has no legal effect.
Concurrent Negligence and the Limits of Indemnity
Many construction losses involve more than one party’s mistakes. RCW 4.24.115(1)(b) addresses that situation directly. When an injury or property damage is caused by the concurrent negligence of the indemnitee and the indemnitor, along with their agents or employees, an indemnity promise is valid and enforceable only to the extent of the indemnitor’s negligence, and only if the agreement specifically and expressly provides for it. That means a subcontractor can agree to cover its own share of fault in a shared-fault incident, but the agreement must say so clearly. Washington drafters often refer to this as a proportional or “to the extent of” indemnity clause, and it should be written with that statutory language in mind. The statute states that this subsection applies to agreements entered into after June 11, 1986.
How Indemnity Interacts With Other Washington Construction Rules
RCW 4.24.115 does not operate in isolation. Washington’s industrial insurance system, its rules on delay clauses, and its construction statute of repose all shape how an indemnity clause works in practice. Contractors and owners in Snohomish County and King County should look at these rules together when they review a contract.
![]()
Waiving Industrial Insurance Immunity Under Title 51
Washington’s industrial insurance law, found in Title 51 RCW, replaces most workplace injury lawsuits with a no-fault benefits system. RCW 51.04.010 declares that sure and certain relief for injured workers is provided regardless of questions of fault and to the exclusion of every other remedy, and that civil actions for such personal injuries are abolished except as provided in that title. This protection is often called industrial insurance immunity. A problem arises when a subcontractor’s employee is hurt and sues the general contractor, and the general contractor then looks to the subcontractor for indemnity. Under RCW 4.24.115(1)(b), an indemnity agreement may waive the indemnitor’s immunity under Title 51 only if the agreement specifically and expressly provides for the waiver and the waiver was mutually negotiated by the parties.
Delay Clauses Under RCW 4.24.360
Indemnity is not the only risk-shifting clause Washington limits. RCW 4.24.360 makes void and unenforceable any clause in a construction contract that purports to waive, release, or extinguish the rights of a contractor, subcontractor, or supplier to damages or an equitable adjustment arising out of unreasonable delay caused by the acts or omissions of the contractee or persons acting for the contractee. The statute does not void provisions that require notice of delays, provide for arbitration or another settlement procedure, or provide for reasonable liquidated damages. Contracts that combine a broad indemnity clause with a sweeping no-damages-for-delay clause deserve particularly close review, because both may be partly unenforceable in Washington.
The Six-Year Statute of Repose
Indemnity disputes often arise years after a project ends, when a defect or injury claim surfaces. Washington limits how long that exposure can last. Under RCW 4.16.310, claims covered by RCW 4.16.300, which include claims arising from constructing, altering, or repairing an improvement on real property or performing related design and construction services, must accrue within six years after substantial completion of construction or within six years after the termination of those services, whichever is later. The statute defines substantial completion as the point when an improvement may be used or occupied for its intended use. RCW 4.16.300 specifically benefits persons whose work requires registration or a license under the statutes it lists, so contractors should confirm their own registration status when evaluating long-term risk.
Mistakes That Undermine Construction Indemnity Clauses
Even experienced contractors sign agreements with indemnity language that does not hold up the way they expect. Most of these problems can be avoided with careful drafting and a clear understanding of what Washington law allows.
![]()
Using Broad “Any and All Claims” Language
Form contracts frequently require one party to indemnify the other against any and all claims arising from the work, regardless of who caused them. In Washington construction contracts, that language collides with RCW 4.24.115. To the extent it covers losses caused by the indemnitee’s sole negligence, it is void, and in concurrent negligence situations it is enforceable only to the extent of the indemnitor’s own negligence and only if the agreement specifically and expressly provides for that result. A clause that tracks the statute’s structure is far more predictable than one that reaches for unlimited protection and leaves a court to sort out what survives. Our guide to contract drafting in Washington covers how indemnity fits alongside other key clauses.
Skipping the Mutual Negotiation Record
Because a waiver of industrial insurance immunity is effective only if it is specifically and expressly stated and mutually negotiated, boilerplate waiver language buried in a form may not accomplish what the drafter intended. Parties who rely on these waivers should make the waiver conspicuous, discuss it openly, and keep records showing that both sides actually considered and agreed to it. Initialed provisions, correspondence about the clause, and revised drafts can all help show that the waiver was part of a real negotiation rather than a take-it-or-leave-it term.
Copying Clauses From Another State’s Forms
National contractors and online templates often use indemnity language designed for other states’ laws. A clause that is standard elsewhere may be partly void in Washington, and it may not contain the express language Washington requires for concurrent negligence indemnity or immunity waivers. Before signing or reusing a form for a project in Snohomish County or King County, review it against RCW 4.24.115 and RCW 4.24.360 rather than assuming it was written with Washington law in mind.
Overlooking Design and Trucking Agreements
Many people think of RCW 4.24.115 as a rule only for general contractors and subcontractors. The statute also applies to contracts for architectural, landscape architectural, engineering, and land surveying services, and to motor carrier transportation contracts covering the transportation of property for compensation or hire, entrance on property to load or unload, and related services such as storage and moving equipment. Design firms, haulers, and suppliers that deliver materials to job sites should review their own indemnity terms with the same care as builders do.
Final Thoughts
RCW 4.24.115 draws clear lines around construction indemnity in Washington. Indemnity for an indemnitee’s sole negligence is void, indemnity for concurrent negligence is enforceable only to the extent of the indemnitor’s negligence and only with specific and express language, and a waiver of industrial insurance immunity requires both express language and mutual negotiation. Related rules on delay clauses and the six-year statute of repose round out the picture.
Reviewing these provisions before you sign, rather than after a claim arises, is the most reliable way to protect your business. Clear, Washington-specific contract language reduces disputes and helps every party on a project understand the risk it is accepting.
If you are a contractor, owner, or design professional in Snohomish County or King County, Washington, contact Bountiful Law to speak with our team. We’ll review your agreements, explain how Washington law applies, and help you take the next step with confidence.